Reg (EU) 2024/2847Generate dossier — €149
LIVE — Enforcement tracker · Deadline dashboard · Transposition status — Updated weekly from EUR-Lex, Safety Gate, OEIL & 12 official sourcesView regulatory intelligence →

You ship smart home products from Shenzhen to Amazon FBA warehouses in Europe. Each new FBA shipment after 11 December 2027 is a new placement on the EU market. Article 69 of Regulation (EU) 2024/2847 exempts products placed before the deadline — but your January 2028 replenishment shipment is not exempt. Every connected ASIN needs CRA documentation under Annex VII. CRACheck generates it.

The FBA logistics model creates a specific CRA exposure: you replenish inventory regularly. Products in the FBA warehouse that were shipped before 11 December 2027 may be exempt under Article 69. But the next container from Shenzhen that arrives in January 2028 is a new market placement — and every unit in it must be compliant. If you manage 20 smart home ASINs and replenish monthly, you need 20 CRA dossiers ready before the first post-deadline shipment. CRACheck generates 8 PDF documents per product. 15-25 minutes each. €149 per ASIN. Browser-side.

Generate CRA dossier — €149Free: check your product classification

€149 one-time · 8-document ZIP · 15-25 minutes · Browser-side

Regulation (EU) 2024/2847 · Art. 31 + Annex VII · 8 documents · 100% browser-side

Key numbers

Art. 69
Products placed before 11 Dec 2027 are exempt. New FBA shipments after that date are not.
20+ ASINs
Typical smart home FBA seller catalogue. Each connected ASIN needs its own CRA dossier.

CRA compliance for your entire FBA smart home catalogue

1
Inventory connected ASINs
List every ASIN with WiFi, Bluetooth, Zigbee or any data connection. Smart plugs, LED strips, trackers, scales, switches, sensors.
2
Classify each ASIN
Most smart home products are Default. Cameras, locks, baby monitors are Class I. Use CRACheck classifier.
3
Prioritise by replenishment schedule
Which ASINs will you replenish first after December 2027? Start with those.
4
Generate dossiers in batches
Use volume pricing: €1,199 for Professional Pack (70 generations), 15-25 minutes per ASIN.
5
Store for Amazon compliance dashboard
When Amazon opens CRA compliance, upload immediately for all ASINs.

FBA smart home CRA mistakes

ART. 69

My products are already in FBA — they are exempt

Article 69 exempts products placed on the market before 11 December 2027. Products in FBA warehouses that were shipped before that date are covered. But your next replenishment shipment after the deadline is a new placement. If you sell 500 units per month and replenish monthly, every post-deadline shipment must comply.

SCALE

I will get CRA documentation when Amazon asks — like I did with GPSR

With GPSR, you needed one declaration per product. CRA requires 8 documents per product, including technical documentation under Annex VII. Producing 8 documents for 20 ASINs under 48-hour pressure from Amazon is not feasible. GPSR was one document. CRA is eight. Prepare now.

ART. 3(13)

The Shenzhen factory is the manufacturer — I am just the Amazon seller

If your brand name appears on the Amazon listing and product packaging, you are the manufacturer under Article 3(13). The factory manufactured the hardware. You placed the product on the market under your trademark. The CRA documentation obligation is on the entity whose name is on the product.

What each CRACheck dossier contains: 8 documents

For a 20-ASIN smart home catalogue, CRACheck generates 160 PDF documents (8 per ASIN × 20 ASINs). Each dossier is product-specific.

1

Product Classifier

Determines product category per Annex III. Defines conformity assessment route under Art. 32.

2

Technical Documentation

Complete technical documentation structured per Art. 31 and Annex VII. All 8 mandatory sections.

3

Risk Assessment

Cybersecurity risk assessment per Art. 13.2 and Art. 13.3. Mapped against Annex I Part I requirements.

4

User Information

Information and instructions per Annex II. Security properties, support period, vulnerability reporting.

5

Declaration of Conformity

EU declaration of conformity per Art. 28 and Annex V.

6

CVD Policy

Coordinated Vulnerability Disclosure policy per Annex I Part II.

7

ENISA Notification Template

Pre-structured for 24h early warning, 72h notification, 14-day final report under Art. 14.

8

Obligations Calendar

Key dates: Art. 14 from 11 Sep 2026, full enforcement 11 Dec 2027, support period per Art. 13.8.

Mira antes de comprar — Descargar dossier de muestra (PDF, empresa ficticia) — Estructura real, artículos reales, formato real. Datos ficticios.

Generated in your browser. No product data is transmitted to any server.

Volume pricing for FBA catalogues

🧾 COMPLIANCE AGENCY FOR 20 SMART HOME PRODUCTS
€40,000–€100,000
€2K-€5K per product × 20 ASINs. 2-4 months per batch.
✓ Last regulatory check: 1 May 2026 · No substantive changes detected · View history