Regulation (EU) 2023/1115 · VerifiedGenerate the DDS — €199

Your European Feed Buyer Needs the EUDR Dossier for the Next Brazilian Soy Cargo. The Trading House Aggregates from 3,000 Farms Across Mato Grosso. Here's the Document in 15 Minutes.

Brazil is the world's largest soy producer and exporter. Key states: Mato Grosso, Paraná, Rio Grande do Sul, Goiás. The Soy Moratorium has been in place since 2006. CAR is mandatory. The additional EUDR cost for Brazilian agriculture is estimated at US$17.5 billion/year. Brazil is standard risk under Reg (EU) 2025/1093. Full DDS required. EUDRCheck generates the dossier in 15 minutes. €199 per lot.

Generate the DDS — €199Free diagnostic: do you need an EUDR DDS?

€199 · One-time · 28-page professional dossier + TRACES NT files · Your data never leaves your browser

Built on Regulation (EU) 2023/1115 · Amended by Regulation (EU) 2025/2650 (23.12.2025) · Annex II fully structured · GeoJSON RFC 7946 validated in-browser · 100% browser-side — your data never leaves your computer

The numbers that matter for Brazilian soy exports to the EU

Brazil is the world's #1 soy producer and exporter. Mato Grosso, Paraná, Rio Grande do Sul and Goiás lead production. The EU imports Brazilian soy for animal feed and processing.

Standard risk. Full DDS required. The Soy Moratorium and CAR are internal Brazilian tools — they do not replace the EUDR DDS.

#1 worldwide
Brazil is the world's largest soy producer and exporter
Standard risk
Full DDS required
€199
per lot for the complete EUDR dossier

What the EUDR requires

Under Article 4 and Annex II.

1
Commodity
HS 1201 (soybeans), 1507 (soy oil). Annex II point 2.
2
Country of production
Brazil — state + municipality (Mato Grosso–Sorriso, Paraná–Londrina, Goiás–Rio Verde). Annex II point 3.
3
Geolocation
Each production plot. 6 decimals, WGS-84. Annex II point 4.
4
Traceability
Farm/cooperative/trading house/EU importer. Annex II point 5.
5
Legal compliance
Forest Code (Law 12.651/2012), CAR, Soy Moratorium, indigenous rights, FPIC. Art. 2(40) + 3(b).
6
Risk assessment
14 criteria. Mandatory (standard risk). Art. 10.

EUDRCheck generates the dossier in 15 minutes.

Three most common mistakes

Pattern 1 — Soy Moratorium or CAR as Article 10 substitute

Complementary evidence, not DDS

The Soy Moratorium and CAR are internal tools. Art. 10.2(m): complementary.

Pattern 2 — Silo/trading house coordinates

Farm-level plot GPS required

Silo or trading house coordinates are not valid. Art. 2(28) requires the production plot.

Pattern 3 — Standard risk = full DDS mandatory

No simplified regime for Brazil

Brazil is standard risk. No micro/small primary operator exemption applies.

What you receive: an 8-document EUDR dossier

EUDRCheck does not generate a single PDF. It generates a complete dossier of eight structured documents, delivered as a ZIP file you download and keep. Every document cites the specific EUDR article it complies with.

1

Scope Dictum

Identifies your role (operator / trader / downstream), applicable regime, legal timeline. Article 2 + Article 8.

2

Pre-filled DDS

Signable PDF + TRACES NT-importable JSON. Every Annex II field completed with your data. Article 4 + Annex II.

3

Validated GeoJSON

File compliant with RFC 7946 + WGS-84. Points for plots under 4 ha, polygons for plots over 4 ha. Visual PDF included. Article 2(28) + Annex II.4.

4

Formal Risk Assessment

Systematic analysis of the 14 criteria of Article 10.2 (letters a to n). Formal conclusion on risk level. Article 10.

5

Risk Mitigation Plan

Mitigation measures adopted or recommended when risk is standard or high. Article 11.

6

Supply Chain Mapping

Upstream and downstream map with full traceability data. Annex II.5.

7

Country-of-production Legal Checklist

Eight dimensions of Article 2(40). Article 2(40) + 3(b).

8

Post-DDS Calendar + Compliance Reminders

ICS calendar file with annual review, 5-year retention requirement, 72-hour amend/withdraw window. Article 12 + Article 32.

Generated from your own input, in your own browser. No data leaves your device.

What you pay

🧾 CONSULTANCY IN SÃO PAULO, CUIABÁ OR EU
€2,000–€5,000
1-3 weeks.
✓ EUDRCHECK
€199
28-page dossier. 15 min.

Dossier and farm data: two layers

● LAYER 1

DDS

8 docs. 15 min. €199.

∅ LAYER 2

Farm-level plot GPS

CAR and monitoring systems contain partial data. EUDRCheck imports and validates.

We do not sell field data collection.

Enforcement reality

Under Article 25.

🇪🇺
Fines — minimum 4% of EU annual turnover
≥ 4%

Article 25.2(a) requires Member States to impose fines with a maximum of at least 4% of the operator's or trader's total annual EU-wide turnover in the financial year preceding the fine decision. The maximum may be raised to exceed the economic benefit gained.

🇪🇺
Confiscation of the commodity and its revenues
100%

Article 25.2(b) and (c) — the relevant product and the revenues from its transaction may be seized by national customs and competent authorities.

🇪🇺
Exclusion from EU public procurement
12 months max

Article 25.2(d) — temporary exclusion from tendering procedures, grants and concessions for a maximum of 12 months.

🇪🇺
Temporary market ban in serious or repeated cases
Indefinite

Article 25.2(e) — prohibition on placing relevant products on the EU market until full compliance is demonstrated. Applies to the European buyer, who will pass the consequence upstream to the non-compliant supplier.

Article 25.5.

Alternatives

AlternativeCostWhat you get
Consultancy (São Paulo, Cuiabá, EU)€2,000–€5,0001-3 weeks
Enterprise (Agrosatélite, Agrotools)€8,000–€20,000/yrYearly
Soy Moratorium membershipN/AComplementary
EUDRCheck€19928-page dossier

Aggregating from 3,000 farms? Volume pricing.

Email hello@solidwaretools.com.

Request Volume Pricing
One-business-day response

What EUDRCheck guarantees and what it doesn't

EUDRCheck generates a document structured under Article 4 and Annex II of Regulation (EU) 2023/1115 (as amended by Regulation (EU) 2025/2650) based on the information you enter. The truthfulness, accuracy and completeness of that information is your responsibility as operator or supplier of the consignment.

We guarantee that the document structure follows Article 4 and Annex II of Regulation (EU) 2023/1115 and that the legal references cited are correct as of the latest verification date. We do not guarantee that a specific document will be accepted by a market surveillance authority in a specific case, nor by a commercial buyer in a procurement process.

EUDRCheck is not legal advice. For specific situations, consult a lawyer or specialised regulatory consultancy.

Frequently asked questions — Brazilian soy exporters

Standard risk. Full DDS?
Yes. Mandatory for all exporters.
Soy Moratorium replaces DDS?
No. Art. 10.2(m): complementary evidence.
CAR = EUDR geolocation?
No. CAR delimits the property. EUDR requires the soy production plot coordinates.
Who files?
EU operator.
Privacy?
Browser-side.
Legal advice?
No.
⚠️ Important notice: EUDRCheck is a self-assessment documentation tool, not legal advice and not a third-party audit. The document under Article 4 and Annex II of Regulation (EU) 2023/1115 is generated from your input data. You are responsible for the accuracy of the data you provide. EUDRCheck does not replace a qualified professional assessment and does not provide the EU Responsible Person service.

Skip the consultancy queue. Generate the dossier in your browser in 15 minutes.

Eight documents. Annex II fully structured. Regulation (EU) 2023/1115 in its current wording including Regulation (EU) 2025/2650 amendment of 23 December 2025. Your data stays on your device. The ZIP you download is yours forever.

€199 one-time
28-page professional dossier · 15 minutes · No subscription · Browser-side
Generate the DDS — €199
✓ Last regulatory check: 27 April 2026 · No substantive changes detected · View history